PPAP and FAI evidence pack, always ready
If you machine for automotive, aerospace or medical devices, you go through IATF 16949, AS9100 or ISO 13485 audits, and every new part needs its PPAP or first article inspection report. With iLEAN, every verified setup, every first article, every material receipt and every validated measurement automatically generates its evidence: photo, data, signature and time.
Weeks before every audit go into proving what the shop already did right.
If you machine for automotive, aerospace or medical devices, you go through IATF 16949, AS9100 or ISO 13485 audits, and every new part needs its PPAP or first article inspection report. Before every audit someone spends weeks gathering dimensional reports, mill certificates, setup records and signatures. The auditor finds gaps and raises non-conformities.
- If you machine for automotive, aerospace or medical devices, you face IATF 16949, AS9100 or ISO 13485 audits, and every new part needs its PPAP or first article inspection report.
- The evidence exists, but it is scattered: dimensional reports in Excel, mill certs in a binder, setup records on paper, signatures in someone's drawer. Each source is fine on its own; together they are a scavenger hunt.
- Before each audit someone spends weeks gathering it, and every new part number repeats the exercise for its own PPAP or FAI, usually against a customer deadline.
- The auditor still finds gaps, and the non-conformities they raise are almost always documentation, not machining. The parts were right; the paper could not prove it.
Edge and Connect capture at the moment; Agents files it by part number and standard.
With iLEAN, every verified setup, every first article, every material receipt and every validated measurement automatically generates its evidence: photo, data, signature and time. Agents organizes it by part number and by standard, and assembles the PPAP or FAI for the period. The quality lead reviews the package and signs it off before sharing it. The auditor downloads it from the web, and nobody on the floor has to rebuild anything.
Every verified setup, first article, material receipt and validated measurement leaves its evidence — photo, data, signature and time — at the moment it happens. A package rebuilt afterwards inherits every gap of what nobody wrote down; this one has none to inherit, because nothing is rebuilt. The shop keeps working; the pack keeps itself current, part number by part number.
Building a PPAP by hand versus a pack that is always current
| Aspect | Today | With iLEAN Agents |
|---|---|---|
| Preparing for an AS9100 or IATF audit | Weeks of gathering | Package already generated |
| PPAP or FAI for a new part number | Assembled by hand | Assembled by Agents, signed by quality |
| Mill certs and heat traceability | In a binder by delivery | Linked to each part number |
| Setup and first-article records | Paper, if found | Photo, data, signature and time |
| Missing record for a part number | Found by the auditor | Flagged when it happens |
| Getting the pack to the auditor | Printed or emailed piecemeal | Downloaded from a scoped web view |
Weeks gathering evidence before each audit → package generated automatically. Non-conformities from documentation gaps → full traceability by part number. PPAP and FAI assembled by hand → assembled by Agents and signed off by quality.
Impact estimate — to be validated with your audits and PPAPs per year.
The block below is an estimate to be validated against your plant's actual data. We put it forward so the committee has an order of magnitude; we refine it during the assessment.
- Estimated payback 6-12 months, depending on audits and PPAPs or FAIs per year.
- From weeks of audit preparation to zero: the package exists before the auditor asks for it.
- Fewer non-conformities from documentation gaps, with full traceability by part number from mill cert to final measurement, and gaps flagged weeks before an auditor could find them.
- And a protected supplier rating, which in a job shop decides who gets the next RFQ and who is quietly dropped from the approved list.
Payback 6-12 months · from weeks of audit prep to zero (estimate to be validated) You go from weeks of preparation to zero, with fewer non-conformities from documentation gaps and a protected supplier rating. We estimate a 6 to 12 month payback depending on audits and PPAPs per year; estimate to be validated.
And the fair question from the production manager
“Can we trust Agents to put together a document the customer will judge us on?” — assembling a package from evidence that already exists and is already signed is an anchored task, where the best models drop below 1.5% error [1]. Agents organizes, it does not invent: every element links back to its source, and the quality lead reviews and signs the package before it is shared. Where evidence is missing, the gap is shown in red rather than filled in.
[1] OpenAI paper "Why Language Models Hallucinate", 2025 — on the reliability of AI in anchored tasks.
What people ask about the PPAP and FAI evidence pack
Does it follow the format each customer or standard requires?
Yes. The same evidence is organized against the PPAP elements, the AS9102 FAI forms or the ISO 13485 records, depending on who asks for it. Nothing is captured twice to satisfy two standards. A shop serving both automotive and aerospace customers keeps one set of evidence and simply views it through each standard.
Does it include ballooned drawings and the dimensional results?
It links each validated measurement to its characteristic on the drawing, so the dimensional results section is built from real data rather than retyped. Characteristics without a validated measurement are listed as open, so nothing is signed incomplete.
Does the customer's auditor get access to our ERP?
No. They access a web view limited to the period and part numbers of their audit, and download from there. Nothing else in your systems is exposed, and every download is logged.
What about parts we machined before going live with iLEAN?
They stay where they are. The pack builds from day one forward, and bringing in older records is optional, part number by part number. Most shops start with the part numbers that have an audit or a PPAP coming up.
Who signs the package?
Your quality lead, always. Agents assembles and flags gaps; the signature and the decision to share it with the customer are human. Agents never sends anything to a customer on its own. The quality lead decides what goes out, to whom and when, and that decision is recorded with the package.
More cases from this series
- Lights-out night shift without surprisesConnect, Edge, JIDOKA AI and Agents working together to run CNC cells unattended at night: more spindle…
- Two-tap human validation at the cellWhat iLEAN captures appears on the cell tablet; the operator validates it with two taps before it…
- Modern CNC and robot cell wired to the ERPiLEAN reads what the machine publishes via MTConnect or OPC UA and mirrors it in the ERP; the ERP…
- Drawing revision change caught instantlyiLEAN reads the customer email, spots the new drawing revision and matches it to the job on the machine…
- The shift supervisor, hands-freeThe supervisor dictates issues while walking the floor; iLEAN structures them by machine, job and shift…
- The legacy CNC lathe that now talksAn external camera reads the old CNC control screen: part counter, spindle load and alarms, without…
Ask us for a sample PPAP evidence pack built from a real job.
We work on your plant's real data, not ours. Assessment with no commitment.
Request estimated ROI within 48h ‹ See all cases of CNC machining See metal fabrication and capital equipment