Audit-ready dossier
On audit day, or when a customer requests a PPAP, someone today spends days rebuilding process evidence. With iLEAN Edge + Agents, every mold change, color change or lot startup automatically generates a dossier: first-article photo, process parameters, signed decision log.
What costs money is not the audit, it is the week before it.
IATF 16949 audits and PPAP requests require evidence that today gets rebuilt manually, with non-conformity risk from incomplete documentation.
- The evidence exists, scattered across paper, spreadsheets, the ERP and somebody's memory. That is the honest state of almost any certified molding shop, and nobody is embarrassed about it until the week before an audit.
- The cost is the days spent rebuilding it, and for a molder those days repeat for every customer that requests a PPAP on their own part.
- Reconstructed evidence inherits every gap of whatever nobody wrote down at the time, and a gap found by the auditor is a documentation non-conformity — raised not on what went wrong on the press, but on what the plant cannot prove.
- Meanwhile the quality team is doing archaeology instead of quality, which is the part nobody puts in the budget and everybody pays for anyway, several times a year.
Edge captures at the moment; Agents indexes it against the standard.
Edge captures the photo and parameters for every change; Agents organizes the dossier by certification standard (IATF 16949, PPAP) with zero post-hoc human work. The auditor or customer logs in and downloads the evidence pack for the lot or period.
Direction is the whole difference. A document manager stores what somebody decides to upload afterwards and inherits the same holes; here every mold change, color change and lot startup closes its own dossier — first-article photo, process parameters, signed decision log — at the moment it happens, and what Agents does is reorganize it for whoever is asking.
Audit preparation today versus the permanent dossier
| Aspect | Today | With iLEAN Agents |
|---|---|---|
| Assembling a PPAP package | Days of hunting | Already assembled per part number |
| Evidence of a lot startup | Rebuilt from paper | Closed when it happened |
| First-article photo of a change | Not kept | Stored with its parameters |
| The decision log | Scattered across emails | One dated, signed chain per change |
| A customer asking about last quarter | Someone drops everything for days | A download |
| Documentation non-conformity | Found during the audit | Flagged when the gap appears |
days spent pre-audit or pre-PPAP rebuilding → zero. Documentation non-conformity risk → eliminated.
Impact estimate — to be validated with your numbers.
The block below is an estimate to be validated against your plant's actual data. We put it forward so the committee has an order of magnitude; we refine it during the assessment.
- Estimated payback 6-12 months, depending on how many audits and PPAP requests you serve a year.
- Days of pre-audit and pre-PPAP reconstruction down to zero, and the saving repeats for every customer that asks rather than happening once a year.
- Documentation non-conformity risk effectively removed, because the gap is flagged when it occurs and not when it is found.
- Continuous protection of the IATF certificate and of the preferred-supplier status that conditions which programs you are invited to quote next.
continuous protection of the IATF certification and preferred-supplier status, estimated payback 6-12 months depending on audit/PPAP frequency. Estimate to validate.
And the fair question from the production manager
"Is this just another document manager with a nicer name?" — no, and the difference is when the evidence is created. A document manager waits for someone to upload; here Edge captures the photo and the parameters at the change itself, and extraction of those values is an anchored task where the best models drop below 1.5% error [1]. Agents only rearranges what already exists, which is why it has nothing to invent.
[1] OpenAI paper "Why Language Models Hallucinate", 2025 — on the reliability of AI in anchored tasks.
What people ask about the automatic dossier
Which PPAP elements come out ready?
The ones built from what happens on the floor: first-article evidence, the process parameters of the approved run, material certificates and the signed decision log. The engineering elements — drawings, design records, tooling documentation — stay where they already live, and the dossier links to them rather than duplicating them.
What if a customer has their own dossier format?
That is the normal case for a molder with several customers, and each of them believes their format is the reasonable one. The evidence is the same; what changes is the index it is presented under, and reindexing is exactly the work being repeated by hand today, customer by customer.
What about parts we molded before deploying iLEAN?
They stay as they are, in whatever form they were kept. The dossier builds forward from day one, and plants usually find that the first audit after deployment is already noticeably lighter without anyone touching the history.
Does it replace our document control system?
No. It feeds it, or sits beside it, and the procedures you already have stay valid. What it replaces is not a system at all: it is the person who spends the week before an audit reconstructing evidence that should have been closed months ago.
Can we give a customer access to their own part numbers only?
Yes, and it is one of the most asked-for features in a plant that subcontracts for several customers at once: the scope of what each one can see is defined per part number and per period, so nobody ever sees a neighbor's part running on the press next door.
More cases from this series
- Supervisor's voice, liveWith a headset and Connect voice mode, the floor supervisor logs incidents without ever stopping to type.
- The press panel that talksAn external camera reads an old, unnetworked injection press panel; its process parameters get digitized…
- Two-tap validationNothing iLEAN captures reaches the central system without a human confirming it first, in seconds, from…
- Paperless lot startupThe operator photographs the process sheet and traveler card at press startup; the lot exists in the…
- Resin delivery in secondsOne photo of the delivery note and CoA; iLEAN digitizes and traces the lot before it enters the…
- Resin drying straight to ERPiLEAN watches the resin drying control folder, validates the data, and posts it to the ERP. Up to 80%…
Tell us how many audits and PPAP requests you served last year and what each one cost in days.
We work on your plant's real data, not ours. Assessment with no commitment.
Request estimated ROI within 48h ‹ See all cases of automotive plastic injection See automotive