The traceability dossier that builds itself

RMA response from days to hours · payback 6-12 months

‹ See all cases of electronics manufacturing services

Quality manager in an EMS plant reviewing a board genealogy on a large screen, with a finished unit and its serial-numbered label on the desk and the SMT floor behind glass
The problem

The evidence exists. It just does not exist together.

Which component reels, which operator, which feeder, which AOI/ICT result and which changeover correspond to that board live today in scattered reports.

  • Which reels, which operator, which feeder positions, which AOI and ICT results and which changeover correspond to a given board is knowable today — in four different places, none of which share a key.
  • Rebuilding that for one serial number means pulling the MES, the AOI exports, the kitting travelers and somebody's memory, cross-checking them by hand, and accepting whatever gaps remain. It takes days.
  • Meanwhile the OEM customer who raised the RMA is counting those days on your scorecard, and a late answer costs more than the failed unit ever did, because response time is scored whether or not the fault turns out to be yours.
  • At audit time the same work repeats in full for every certifying standard and every customer with the right to audit, which in a multi-customer plant means several times a year, each one asking for the same evidence indexed a different way.
How it fits the IRIS system

Edge captures per critical change; Agents organizes by standard and by serial number.

Edge (pre/post photos + data per critical change) + Agents (organizes by certifying standard or by RMA request, generates a dossier structured by serial number or period). The auditor or OEM customer downloads the evidence pack from the web with zero human post-hoc work.

Every critical change leaves its pre and post evidence at the moment it happens. Anything rebuilt afterwards inherits the gaps of whatever nobody wrote down — and it is precisely in the assembly that a nonconformity appears. The dossier is not produced for the audit; it already exists when the audit is announced.

See the full IRIS architecture →

Before and after

Today's traceability versus the dossier that builds itself

AspectTodayWith iLEAN Edge and Agents
Rebuilding one board's genealogyDays across four sourcesMinutes, by serial number
RMA responseDaysHours
Where the evidence livesScattered reportsOne downloadable evidence pack
For each auditing customerThe work repeats in fullSame evidence, another index
A missing recordDiscovered during the auditFlagged when it should have been generated
Who assembles itA person, afterwardsNobody: it closes as it happens

Days rebuilding traceability → minutes. Non-conformance risk or late response to the OEM customer → eliminated.

Impact estimate

Impact estimate — to be validated with your numbers.

The block below is an estimate to be validated against your plant's actual data. We put it forward so the committee has an order of magnitude; we refine it during the assessment.

  • Estimated payback 6-12 months, counting the assembly work that disappears across RMAs and audits.
  • RMA response from days to hours, which is the metric an OEM customer actually scores you on and the one that conditions the award of the next program.
  • Days of rebuilding traceability down to minutes, whether the question comes by serial number, by reel lot or by period.
  • And nonconformity risk over missing documentation removed, because a gap is flagged the day it occurs rather than in front of the auditor, when the only options left are an explanation and a corrective action plan.

RMA response from days to hours · payback 6-12 months. Estimate to be validated.

And the fair question from the production manager

“Isn't this just another document manager?” — the difference is direction. A document manager stores what somebody decides to upload afterwards, and inherits the same gaps. Here the dossier closes the instant the change happens, and Agents reindexes it for whichever standard or customer asks. Matching a captured record to its serial number is an anchored task where the best models drop below 1.5% error [1].

[1] OpenAI paper "Why Language Models Hallucinate", 2025 — on the reliability of AI in anchored tasks.

Frequently asked questions

What people ask about the traceability dossier

Does it trace down to the component reel?

That is the point of it: reel lot, feeder position, work order, operator, changeover and inspection results, all hanging from the board's serial number, and all captured by the cases that already run upstream.

Does the auditor get access to our systems?

No. They open a view scoped to the period and scope of their audit, filter, and download the evidence pack from the web. Nothing outside that scope is exposed, which is what makes it acceptable to share with a customer who is also a competitor's customer.

Does it serve several certifying standards at once?

Yes, and that is where the repeated work disappears: the evidence is the same, what changes is the scheme it is indexed against for each standard or each customer's own supplier requirements.

What about a board built before we deployed it?

The dossier builds forward from day one. Bringing in historical records is optional and is scoped separately, because it is a data migration rather than a capture case and should be priced as one.

How does it help with a field failure on one serial number?

It answers the question that actually matters: which other boards share that reel lot, that feeder setup or that changeover, so containment is bounded to them instead of widened to the month as a precaution.

Let's talk

Tell us how long your last RMA took to answer with full traceability.

We work on your plant's real data, not ours. Assessment with no commitment.