Strip and resin receiving with one photo

In a connector plant, receiving strip, resin and components means typing line by line into the ERP. With iLEAN Connect the receiving lead photographs documents and labels, the AI extracts lot, heat number and quantities, and after one validation tap everything enters the ERP with the certificate attached.

‹ See all cases of electronic connectors

Receiving lead scanning the label of a coiled strip pallet with a phone, with bags of PA66 GF30 resin behind and a tablet receiving summary ready to validate and send to the ERP
The problem

Connector traceability starts at the dock, typed in a hurry.

Receiving gets coils of copper alloy strip, gaylords of engineering resin and component reels, each with its packing list, lot labels and supplier certificate of conformance. The receiving lead has to enter every line in the ERP: lot, heat number, quantity, certificate. Either the truck waits, or entry is rushed and a resin lot is traced wrong just when the customer asks for an assembly's genealogy.

  • Receiving takes coils of copper alloy strip, gaylords of engineering resin, plating chemicals and component reels, each with its packing list, lot labels and certificate of conformance. No two suppliers lay them out the same way, and some still send handwritten corrections on the packing list.
  • The receiving lead types every line into the ERP: lot, heat number, quantity, certificate. Either the carrier waits at the dock, or entry is rushed to free the door.
  • A rushed heat number is invisible that day. It surfaces months later, when a customer asks for the genealogy of an assembly and the strip lot does not match what the traveler says.
  • The certificate itself often ends up in a binder, not linked to the lot it certifies, and is hard to find when an auditor asks for it.
How it fits the IRIS system

Connect in photo mode at the dock — packing list, labels and certificate in one go.

With iLEAN Connect, they photograph the packing list, the labels and the certificate. The AI reads barcodes, QR codes and text, extracts lot, heat number, quantity and dates, and matches them against the purchase order. The lead sees the summary with discrepancies flagged, confirms with one tap and iLEAN posts it to the ERP via API. The certificate stays attached to the lot for good.

The heat number of the strip is where connector genealogy begins. Captured at the dock, with its certificate attached, every later question about a terminal lot has an answer that does not depend on a binder. The receiving lead still decides what gets booked. The time saved at the dock is the visible gain; the traceability that holds up in a complaint months later is the larger one.

See the full IRIS architecture →

Before and after

Dock entry by hand versus dock entry by photo

AspectTodayWith iLEAN Connect
Heat number of the strip coilTyped under pressureRead from label and certificate
Certificate of conformanceFiled in a binderAttached to the lot for good
Packing list vs. purchase orderChecked if there is timeDiscrepancies flagged before booking
Carrier waiting timeLine-by-line typingMinutes
Warehouse module seats at the dockSeveral active usersOne validator
Resin lot to housing lotRebuilt during a complaintTraceable from the dock

Before: line-by-line entry, carrier waiting time, mis-traced lots. After: receiving in minutes, discrepancies flagged, certificate linked to the lot.

Impact estimate

Impact estimate — to be validated with your numbers.

The block below is an estimate to be validated against your plant's actual data. We put it forward so the committee has an order of magnitude; we refine it during the assessment.

  • Estimated payback 3-8 months, counting dock time and carrier waiting time, truck after truck.
  • License angle: typical reduction of 50-70% in receiving/warehouse module licenses, recurring, depending on vendor pricing and to be checked against your contract.
  • Discrepancies between packing list, labels and purchase order caught before the material is booked, not weeks later at inventory count, when the truck is long gone.
  • Strip heat numbers and resin lots traceable from the dock to the shipped connector, which is the first link of every genealogy and the one most often missing in a complaint.

Estimated payback of 3 to 8 months plus recurring license savings: typical reduction of 50-70% in the receiving/warehouse module and less carrier waiting time. Estimate to be validated.

And the fair question from the production manager

“Every mill and resin supplier labels differently.” — that is normal and expected: barcodes and QR codes are decoded where present, printed text is read where not, and no per-supplier template is needed. Extracting lot, heat number and quantity is an anchored task, where the best models stay below 1.5% error [1], and the receiving lead confirms before anything enters the ERP. Discrepancies are shown, never silently resolved, and the photos stay archived as receiving evidence for an audit.

[1] OpenAI paper "Why Language Models Hallucinate", 2025 — on the reliability of AI in anchored tasks.

Frequently asked questions

What people ask about photo receiving for strip and resin

Does it read the heat number from the mill certificate?

Yes, and it cross-checks it against the coil label, so a mismatch between certificate and coil is flagged before booking. The certificate values, such as alloy, temper and coating, stay attached to the coil.

Can one receipt cover a pallet with several resin lots?

Yes. Several photos of the same pallet are grouped into one receipt, with each lot booked separately and its own label kept. Resin lot traceability then follows each gaylord into housing molding and onto the traveler of every lot that uses it.

What if the delivered quantity differs from the purchase order?

The difference is highlighted on the summary; the receiving lead decides whether to book a partial receipt or hold it. Purchasing sees the difference immediately and can raise it with the supplier the same day, with the photo of the packing list attached as proof.

Do plating chemicals and component reels work the same way?

Yes. The documents differ, but the model reads packing lists, labels and certificates without a template per supplier. A new supplier needs no setup work, which matters when a second source is qualified in a hurry.

Can dock receiving go live before the other cases?

Yes. It has no dependencies and shows its effect from the first truck, which is why it is often the first step in a connector plant. It also feeds the genealogy that later cases rely on, starting with the lot traveler.

Let's talk

Tell us how long it takes your dock to book in a truck of strip coils.

We work on your plant's real data, not ours. Assessment with no commitment.

Request estimated ROI within 48h ‹ See all cases of electronic connectors See electronics