The electrical tester, stitched into the MES and ERP
The continuity tester for cable assemblies produces valuable data that stays isolated and gets retyped. iLEAN Connect stitches the tester into the MES and ERP via API: every result is linked to the order, the serial number and the component lot.
The tester knows which assembly failed; the MES only gets a total.
Every cable assembly or harness goes through a continuity and insulation tester. It is fairly modern equipment with data export, but its results stay on the tester PC or on a printed label. To close the order, someone retypes good quantities and rejects into the MES or ERP, and each part's test record is not linked to its serial number or terminal lot. When a customer complains, it is searched by hand.
- Every cable assembly goes through a continuity and insulation tester. It is modern equipment that can export data, yet its results stay on the tester PC or on a printed label. Nobody ever had time to connect it, because the integration project never reached the top of the IT list.
- To close the order, someone retypes good and rejected quantities into the MES or ERP. The per-part record never reaches the system; only a total does.
- So the test result is not linked to the serial number, the terminal lot or the housing lot. When a customer complains, someone searches the tester PC by hand. Sometimes the file has already been overwritten.
- Recurring failures on a given circuit or terminal position stay invisible, because nobody can group results that live in separate files on separate PCs.
Connect bridges the tester and the MES through its API — nothing is replaced.
iLEAN Connect reads the tester output, through its API or the file it already produces, and stitches it into the MES and ERP. Each result is linked to the order, the serial number and the component lot, without replacing any system. When an assembly fails, the reject reaches the cell lead with the failure point and the crimp applicator involved. The person decides the containment; iLEAN gives the full context.
The tester already produces the most decisive record in the plant; it is just stranded. Linked to serial number and terminal lot, a complaint goes from a hunt on a PC to a query of minutes. And none of the systems involved is replaced or recertified. It is the classic case of modern equipment left isolated because the integration project never reached the top of the list.
The stranded tester versus the tester stitched in
| Aspect | Today | With iLEAN Connect |
|---|---|---|
| Result per serial number | On the tester PC | In the MES, by serial |
| Good and reject counts | Retyped to close the order | Posted automatically |
| Failure point on a reject | Printed on a label | Sent to the cell lead with context |
| Link to terminal and housing lots | None | Attached to every result |
| Customer complaint search | By hand, file by file | Minutes |
| Tester, MES and ERP | — | All stay in place |
Before: results stuck on the tester PC, double entry, manual searches when a complaint arrives. After: complete record per part, zero double entry, answers in minutes.
Impact estimate — to be validated with your numbers.
The block below is an estimate to be validated against your plant's actual data. We put it forward so the committee has an order of magnitude; we refine it during the assessment.
- Estimated payback 3-6 months, from removing double entry and shortening complaint response time.
- Double entry removed: good and reject counts reach the MES and ERP without anyone retyping them at the end of the shift.
- Complaint response shortened from a manual search to minutes, with the test record of each part and the lots it was built from, ready to send to the customer.
- And failure patterns by circuit or terminal position become visible across lots and shifts, pointing to a terminal reel or a fixture before a complaint does. Today that analysis is simply impossible.
Estimated payback of 3 to 6 months from removing double entry and shortening complaint response time. Estimate to be validated.
And the fair question from the production manager
“What if the bridge sends a wrong verdict to the MES?” — very little is interpreted here: the tester's own output is read from its API or export file, a task so anchored that the best models stay below 1.5% error [1] even where parsing is needed. Every record keeps the tester's original file as a reference, and the cell lead validates rejects before containment starts. Discrepancies between file and MES are flagged, not overwritten, and retests keep their own record next to the first attempt.
[1] OpenAI paper "Why Language Models Hallucinate", 2025 — on the reliability of AI in anchored tasks.
What people ask about stitching the continuity tester
Does the tester need recertifying after the link?
No. iLEAN reads what the tester already exports, through its API or its result file, and writes nothing back to it. Its validated test program and fixtures stay untouched, so there is nothing to requalify.
Are measured values kept, or only pass and fail?
Both, when the tester exports them: resistance and insulation values per circuit are stored next to the verdict, which makes drift visible before it becomes a reject, for example a resistance creeping up on one circuit.
What does the cell lead see when an assembly fails?
The failing circuit, the terminal position, the crimp applicator in use and the lot, so containment starts with full context. The decision on what to contain stays with the person, who now has the lots in front of them.
Does it work with testers from several makers?
Yes. Each tester's output is mapped once during commissioning; after that, results reach the MES in the same structure, whatever the brand. Mixed tester fleets are the normal case.
Can it keep an order open while rejects are unrepaired?
It flags the order on the MES side so it cannot be closed until each reject is repaired and retested, or scrapped, by a person. The closure is recorded with that person's name, the time and the retest result, which is exactly what a customer asks for when a failed part is in question.
More cases from this series
- IATF 16949 evidence pack, always readyiLEAN Agents organizes each lot's evidence by standard and customer: IATF 16949 and PPAP audits prepared…
- Zero escapes to the automotive customerFour coordinated rings (order, test, vision and evidence) catch on the line what reaches the customer…
- Photograph the traveler at lot start-upOne photo of the traveler and the lot exists in the system from start-up: terminal-resin-assembly…
- The shift supervisor speaks, iLEAN recordsThe supervisor speaks while walking; iLEAN structures the incident by cell, lot and shift and replies…
- Nothing enters the ERP without a human sign-offEverything iLEAN captures goes through a tablet in the cell: the lead validates in two taps before the…
- The metrology spreadsheet reaches the ERP on its owniLEAN reads the metrology spreadsheet on save, validates it with quality and posts it to the ERP. Up to…
Tell us how long it takes today to find the test record of one shipped assembly.
We work on your plant's real data, not ours. Assessment with no commitment.
Request estimated ROI within 48h ‹ See all cases of electronic connectors See electronics