Findings come from the gaps, not from the work

The day the mechanical integrity audit arrives — or the inspector who wants the thickness history of a circuit, or the auditor of a certified management system — somebody spends a week or two reconstructing the evidence. With Edge and Connect, evidence is generated at the moment of the intervention; with Agents, it organizes itself by certification standard and gaps are raised months in advance.

‹ See all cases of PTA-PET polyester

Mechanical integrity engineer at a PTA-PET complex reviewing a pressure vessel file on screen with before-and-after photographs, thickness measurements per point and tabs per inspection standard, with the physical archive of binders behind
The problem

The work was done well. Proving it takes two weeks.

The detail that most annoys a competent maintenance team is that findings almost never come from the work having been done badly. The work is usually done well. They come from not being able to prove it, from a documentation gap. It is a bad mark for the bookkeeping, not for the engineering. Because the evidence does exist: it is on paper, in network folders, in emails, in contractor reports and in the heads of three people. Reconstructing it is a project in itself every single time. And in an asset with years of accumulated preservation, the volume of evidence you need to demonstrate on start-up day — and not only to an external auditor but to the owners themselves — is especially large.

  • Findings almost never come from the work having been done badly. They come from not being able to prove it: a documentation gap. A bad mark for the bookkeeping, not for the engineering.
  • The evidence does exist: on paper, in network folders, in emails, in contractor reports and in the heads of three people. Reconstructing it is a project in itself, every single time.
  • The day the mechanical integrity audit arrives — or the inspector who wants the thickness history of a circuit, or the auditor of a certified management system — somebody spends a week or two on it.
  • In an asset with years of accumulated preservation, the volume of evidence to demonstrate on start-up day — to an external auditor and to the owners themselves — is especially large.
How it fits the IRIS system

Edge and Connect capture; Agents classifies by equipment, by standard and by period.

Edge and Connect capture, Agents organizes.

The function with the most value is not the dossier, it is the gap detection: Agents flags that a circuit has no thickness measurement within its required window months in advance, instead of the auditor flagging it on the day. A gap seen in March is an inspection scheduled; a gap seen at the audit is a finding.

  • Every intervention, inspection and round generates its evidence at the moment: before-and-after photos per point, readings, dictations, certificates, signatures.
  • Agents classifies each piece by equipment, by applicable standard — mechanical integrity program, pressure vessel, piping and tank inspection, relief valve testing, certified management systems — and by period.
  • It assembles the dossier, downloadable by period and by equipment.
  • And it detects gaps on its own: it flags that a circuit has no thickness measurement within the required window, months in advance, instead of the auditor flagging it.

See the full IRIS architecture →

Before and after

Audit preparation today versus the permanent dossier

AspectTodayWith iLEAN Agents
Preparation per auditOne or two person-weeksHours of review
Where the evidence isPaper, folders, emails, three people's headsOne dossier per equipment and period
Documentation gapFound on audit dayFlagged months ahead
Thickness history of a circuitReconstructedA query
Before-and-after of an interventionIf somebody took a photoCaptured at the moment, signed
For the owners on start-up dayA presentation built by handDownloadable by period

from one or two weeks of reconstruction per audit to zero. From discovering the documentation gap on audit day to seeing it flagged months ahead. From "we believe it was done" to "here it is, with photo, timestamp and signature".

Impact estimate

Estimated impact — to validate with your own numbers.

The block below is an estimate to be validated against your plant's actual data. We put it forward so the committee has an order of magnitude; we refine it during the assessment.

  • Estimated payback 6-12 months, depending on audit frequency and scope.
  • Person-weeks of preparation recovered per audit, and documentation non-conformance risk removed.
  • From discovering the gap on audit day to seeing it flagged months ahead.
  • Added benefit: material immediately presentable to the board and to the owners.

estimated payback 6-12 months depending on audit frequency and scope; measured in person-weeks of preparation recovered and documentation non-conformance risk removed. Added benefit: material immediately presentable to the board and to the owners. *Estimate to validate*.

And the fair question from the production manager

«Isn't this just another document manager?» — the difference is direction. A document manager stores what somebody decides to upload, after the fact, and inherits the same gaps. Here the evidence is generated at the moment of the intervention — photo, reading, dictation, certificate, signature — and Agents reorganizes it for whichever standard asks: pressure vessel, piping, tank, relief valve, certified management system. Classifying a piece of evidence by equipment tag, standard and period is an anchored task, where the best models drop below 1.5% error [1], and the mechanical integrity engineer reviews the dossier before it is released to the auditor.

[1] OpenAI paper "Why Language Models Hallucinate", 2025 — on the reliability of AI in anchored tasks.

Frequently asked questions

What people ask about the mechanical integrity evidence pack

Which standards does it organize by?

Those your mechanical integrity program follows: pressure vessel, piping and tank inspection, relief valve testing, and the certified management systems the site holds. The classification scheme is configured with the inspection team, not hard-coded, so a site-specific procedure fits the same way.

Does it need the capture cases deployed first?

It needs evidence to be captured at the moment, and those are the cases that capture it: rounds, thickness readings, certificates, line-up. It grows with each one; it does not wait for all of them, and the first dossier is usually the one for the circuit the last audit flagged.

How does it detect a gap?

It knows the required inspection window per circuit and per equipment, and it knows what evidence exists. When a window is going to close without a measurement, it raises it months in advance to the inspection planner, with the circuit and the date, so it becomes a scheduled job rather than a finding.

Does the auditor get into our systems?

No. They receive a view scoped to the period and equipment of their audit, filter and download. Nothing else is exposed, and the same view serves the owners' representative on start-up day.

What about the history before iLEAN?

It stays where it is. The dossier builds from day one forward; bringing in the archive is optional and is usually done for the critical circuits first — the acetic acid loop, the oxidation reactor, the main compressor.

Let's talk

Tell us how many person-weeks your last mechanical integrity audit took to prepare.

We work on your plant's real data, not ours. Assessment with no commitment.

Request estimated ROI within 48h ‹ See all cases of PTA-PET polyester See chemicals